Upon receiving the keys to a townhouse or villa at Vinhomes Green City, homeowners are presented with a finished exterior shell and an empty interior space. From that moment until the day they move in, the quality of life within the home depends almost entirely on two key decisions: who will design the interior, and who will bring that design to life.
This article provides homeowners with a well-founded approach to selecting interior design and construction firms for their Vinhomes Green City property. It covers the specific responsibilities of each party, the criteria for evaluation, the essential questions to ask before signing a contract, and insights drawn from 3A Signature’s extensive experience in completing homes delivered in a “bare-shell” (raw) state.
What Does the Design Firm for Vinhomes Green City Do?
The design firm for Vinhomes Green City is responsible for reconfiguring the entire interior of a property delivered in a “bare-shell” (unfinished) state covering functional layouts, ceilings, floors, walls, electrical and plumbing systems, lighting, air conditioning, materials, and interior furnishings.
Their work culminates in a comprehensive set of technical documents, detailed enough for both the urban area’s management board to review and for the construction team to execute with millimeter-level precision. The construction firm then takes these documents and carries out the actual build-out of the home on-site.

What Requirements Does Vinhomes Green City Set for Interior Fit-out Contractors?
Vinhomes Green City is an urban development spanning approximately 197.2 hectares in Hau Nghia, Duc Hoa (formerly Long An) situated at the northwestern gateway to Ho Chi Minh City and is divided into five zones: The Liberty, The Swan Lake, The Island, The Forest, and The Sunrise. All low-rise properties, including terraced houses, shophouses, semi-detached villas, and detached villas, will be handed over with their exteriors fully completed, while the interiors will remain in a raw, unfinished state. The first phase of handovers is scheduled for the fourth quarter of 2026.
This means that any interior fit-out contractor entering the project will need to address three distinct sets of requirements.
Terraced Houses and Shophouses: The Challenge of Natural Light and Functionality
Terraced houses represent the most common housing typology, typically featuring a 5-meter frontage, a depth of 12 to 15 meters, and shared side walls. Designers must address several key challenges: bringing natural light into the center of the home, efficiently positioning staircases and utility shafts, and in the case of shophouses separating the commercial entrance from the private residential entry. Specific design principles for this typology were previously outlined in the article on the design of terraced houses at Vinhomes Green City.
Semi-Detached and Detached Villas: Preserving the Exterior, Revitalizing the Interior
These villas offer larger floor areas, multiple open exposures, and private gardens. Since the exteriors follow a unified architectural language specific to each row, the design team’s task is to craft an interior lifestyle that complements this outer shell, while seamlessly connecting the living spaces to the garden. This approach is explored in detail in the articles on the villa design and interior design for Vinhomes Green City.
General Regulations for a Vinhomes Urban Area
In operational Vinhomes urban areas, the completion of low-rise residential units typically involves several steps: registering construction work with the Management Board; submitting detailed drawings for approval; declaring personnel and vehicles used for transporting materials; obtaining access passes for workers; adhering to permitted construction hours; installing protective screening around the site; and maintaining cleanliness in common areas.
The exterior of each unit must remain consistent with the overall design; modifications to elements such as roofing, exterior doors, or balconies are not permitted. Specific regulations for Green City will be announced by the Project Management Board at the time of handover, and an experienced service provider will proactively handle any necessary updates on behalf of the homeowner.
Distinguishing Between Design Firms and Construction Contractors at Vinhomes Green City
A design firm determines what a home will look like, while a construction contractor determines whether the home is actually built according to that vision. Understanding this distinction helps homeowners know what to expect and demand from each party.
What Are the Responsibilities of a Design Firm?
A professional design firm for Vinhomes Green City will provide the homeowner with a comprehensive package, including: floor plans for each level; perspective renderings of key spaces; a schedule of materials with actual samples; ceiling and lighting plans; electrical, plumbing, and HVAC layouts; detailed drawings for custom millwork, bathrooms, and kitchens; and a detailed cost estimate broken down by category. This documentation serves both as a basis for coordination with the Property Management Board and as a set of “ground rules” for overseeing the construction team.
What Are the Responsibilities of the Construction Contractor?
The construction contractor for Vinhomes Green City is responsible for transforming project documentation into a physical structure. This includes organizing the construction site in compliance with local regulations, installing technical systems, completing ceilings, floors, and walls, fitting out interiors, and overseeing quality control, safety, and project timelines. Finally, they are responsible for handing over the property, providing user instructions, and managing warranty terms.
Where Discrepancies Often Arise
Most issues in properties handed over in a “rough” (unfinished) state do not stem from errors in the blueprints or the skill of individual workers, but rather from the points where different elements intersect.
Examples include ceiling heights that prove insufficient for air-conditioning ductwork, electrical outlets that do not align with kitchen cabinetry, the substitution of specified materials with “equivalent” alternatives that differ in shade, or the omission of recessed lighting coves due to the complexity of their execution.
This is why homeowners must clearly understand who is held accountable when there is a discrepancy between the blueprints and the actual site conditions.

5 Criteria for Selecting a Design Firm for Vinhomes Green City
Drawing on extensive experience in fitting out “bare-shell” (unfinished) properties within urban developments managed by a professional property management board, 3A Signature proposes five criteria for homeowners to evaluate any design firm for Vinhomes Green City.
1. Understand the Specific Challenges of Each Property Type
A 5-meter-wide townhouse and a detached villa present entirely different sets of challenges. Ask potential contractors whether they have experience with high-density townhouse projects or villas with pre-defined exterior designs, and request to see how they handled similar projects. A contractor accustomed only to custom-built, standalone homes might suggest modifications that are not permitted within a planned urban development.
2. Working from the Developer’s Documentation Before Handover
A professional firm does not wait until the day the keys are handed over to begin work. By reviewing the developer’s floor plans, elevations, and technical connection points, they can already understand the client’s needs, develop concepts, create visualizations, and establish an interior design direction. Once the property is handed over, the team assesses the actual site conditions to account for any discrepancies before finalizing the technical documentation. This approach significantly shortens the wait time before moving in.
3. Technical Documentation: Detailed Enough for Approval and Execution
A beautiful 3D rendering does not constitute a complete design. Homeowners should ask to see a sample of a technical documentation package previously prepared by the design firm. Check for the following: Are the MEP (mechanical, electrical, and plumbing) drawings coordinated with the ceiling and interior layout? Are there detailed specifications for finishes down to the specific trim profiles and tile grout lines? Is there a comprehensive material schedule that lists product codes and suppliers? The more detailed the documentation, the smoother the coordination with the building management and the fewer unexpected issues will arise during construction.
4. Finalize Materials Using Physical Samples, Not Just Images
The appearance of wood tones on a screen can differ significantly from how they look under the afternoon sunlight in a living room. A meticulous design firm for Vinhomes Green City will arrange samples of stone, wood, fabric, and paint clearly labeled by their intended application on a single presentation board. This allows the homeowner to evaluate the materials both visually and by touch before they are incorporated into the project budget.

5. Architects’ Involvement at the Construction Site Until Handover
Clarify whether the architect will continue to visit the site after delivering the blueprints, and whether they have the authority to request corrections if the construction deviates from the design. In projects overseen solely by engineers, the resulting house may be technically sound, but it often fails to reflect the original vision whether in terms of proportions, material shades, or lighting.

5 Criteria for Selecting a Construction Contractor for Vinhomes Green City
A well-designed plan only reaches its full potential when executed by a disciplined construction team. Here are five factors homeowners should evaluate when choosing a contractor for their project at Vinhomes Green City.
1. Experience Working in Managed Urban Developments
Construction within a managed urban development differs from building a standalone townhouse; it involves specific working hours, regulations for material storage, requirements for site screening and cleanliness, and periodic inspections by the management board. A contractor experienced in this environment will proactively plan logistics, work shifts, and project schedules from the outset, helping to avoid any mid-project work suspensions.
2. Thorough Inspection of a Property Upon Handover
A property handed over in a “shell” (unfinished) state should be inspected before any construction work begins. Key checks include floor elevations, wall flatness, the squareness of corners, the positioning and condition of utility connection points (plumbing and electrical), and any signs of water leakage in the roof or bathroom areas.
All discrepancies should be documented in a written report accompanied by photographs; this serves both to update the design documentation and to provide the homeowner with a formal basis for addressing issues with the developer, if necessary.

3. Installing Technical Systems Based on Integrated Drawings
Electrical, plumbing, HVAC (heating, ventilation, and air conditioning), and smart home systems constitute the “hidden” infrastructure of a house; any error here necessitates costly demolition and repairs. The construction team must precisely route pipes and conduits according to the integrated drawings, verify the clearances between different systems, and check their elevations before the ceilings are closed. Homeowners may also request that the contractor photograph and document the entire technical layout before it is concealed a highly valuable resource for future maintenance.

4. Precision Control Through Measuring Instruments
A 2mm misalignment in tilework might go unnoticed when standing close by, but it becomes clearly visible when viewed along the length of a hallway. High-quality contractors use laser tools to position tiles, stonework, ceilings, and built-in cabinetry, relying on precision instruments rather than the naked eye to verify flatness and vertical alignment.

5. Phased Inspections and Remote Progress Reporting
Most homeowners at Green City live and work in Ho Chi Minh City, approximately 40km away from the project site. The construction team at Vinhomes Green City must implement a system for regular updates including photographs, inspection reports, and progress tracking with clearly defined milestones for the sign-off of each project component.
This ensures that homeowners only need to be present on-site during critical junctures. Furthermore, following the handover, a comprehensive warranty policy and a schedule for periodic inspections covering waterproofing, technical systems, and woodwork are essential.

Should You Choose a Single Firm for Both Design and Construction, or Separate Providers?
For properties handed over in a “rough” (unfinished) state at Vinhomes Green City, selecting a single firm to handle both design and construction is generally the safer choice for most homeowners.
When the designers and the builders belong to the same team, potential issues at the intersection of these two phases such as those mentioned earlier can be resolved internally, sparing the homeowner from having to mediate between separate parties. The architect who created the design also oversees the construction to ensure it aligns with the original vision, with a single point of accountability for the final outcome.
Opting for separate firms can still be a viable approach if you already have a trusted architect or the time to closely monitor the construction process. In such cases, the contract should clearly define the design team’s role in “author’s supervision” including their authority to request corrections and establish a protocol for addressing discrepancies between the design documents and the actual site conditions.
Regardless of the approach, the construction team for your Vinhomes Green City project should be brought on board before the technical documentation is finalized, allowing them to provide input on feasibility.
Questions to Ask Before Signing a Contract
The ten criteria mentioned above can be translated into specific questions for your initial meeting. Reliable answers should be supported by concrete examples such as the names of completed projects, photographs, or specific documentation rather than vague promises.
- In which residential developments have you completed projects? Can I review construction logs or visit a completed site?
- Can you begin the design process using the developer’s original plans before I officially take possession of the property?
- What does the final technical documentation package include? May I see a sample set?
- Are materials approved based on physical samples, or only through digital renderings?
- Who handles the construction registration process and prepares the drawings for submission to the property management office?
- Will the architect supervise the construction work, and how frequently will they be on-site?
- Are the technical systems (plumbing, electrical, etc.) photographed and documented before the ceilings are closed or walls are clad?
- How will I be kept updated on the project’s progress when I am not on-site?
- What are the key milestones for inspection and sign-off? What are the terms for post-completion warranty and maintenance?
How Does 3A Signature Support Homeowners at Vinhomes Green City?
3A Signature specializes in the design and construction of villas and townhouses with a “Modern Tropical” aesthetic, accompanying homeowners from the initial conceptual drawings all the way through to the post-handover phase. For properties at Vinhomes Green City, 3A serves a dual role acting as both the design firm and the general contractor for interior fit-outs in accordance with the company’s two core service workflows.
10-Step Design Process
The design process follows 10 distinct stages: listening and personalization, site context analysis, conceptual design, architectural visualization, interior design direction, interior visualization, preparation of technical documentation, cost estimation, construction and supervision, and warranty and maintenance.
At Green City, the initial phases from the initial consultation to interior visualization begin as soon as the client’s project documentation is received. Upon handover of the property, our team conducts an on-site assessment to finalize the technical documentation and cost estimates.
Execution Based on an 11-Step Process (Excluding Structural/Shell Work)
The construction process follows 3A’s 11-step methodology. Since the structural framework and exterior envelope have already been completed by the project owner, the structural/shell construction phase is omitted. The scope of work focuses on the following:
- Technical and legal preparation: reviewing documentation, preparing drawings, and assisting with construction registration with the property management board.
- Site survey and organization: verifying elevations, surface flatness, and utility connection points, as well as designating areas for material storage.
- Construction planning and budget alignment: establishing schedules, selecting materials, defining finishing standards, and setting milestones for inspections.
- Installation of MEP (mechanical, electrical, and plumbing) systems: including electrical, water, lighting, HVAC, ventilation, and smart home systems.
- Interior architectural finishing: walls, ceilings, flooring, stonework, tiling, glass installations, and interior doors.
- Interior furnishing: kitchens, cabinetry, bedrooms, bathrooms, and prayer rooms (altar rooms).
- Landscape construction: villa gardens, light wells (atrium voids), and rooftop terraces for townhouses.
- Dual-layer supervision: engineers oversee technical aspects, progress, and safety, while architects monitor materials, lighting, and spatial proportions.
- Inspection, handover, and operational guidance.
- Warranty, maintenance, and after-sales support in accordance with 3A’s post-handover care policy.

A Project Showcasing 3A’s Working Methodology
3A’s approach to site management is transparently documented through the project log for Lumina Retreat Villa at SwanBay covering everything from initial site surveys and material selection to the installation of concealed HVAC systems and precision tile laying guided by laser alignment. The images featured here depicting the raw structure, material specifications, HVAC systems, and tiling work all originate from this specific project.

For homeowners looking to learn more about home finishing in the area, it may be helpful to explore information on high-end interior construction services in Long An.
Frequently Asked Questions Regarding Design Firms for Vinhomes Green City
Can Owners at Vinhomes Green City Choose Their Own Design and Construction Firms?
Yes. Townhouses, shophouses, and villas at Vinhomes Green City are handed over with finished exteriors but unfinished (bare-shell) interiors; therefore, owners are free to select their own design and construction firms for the interior spaces. The chosen firm must register their construction work and comply with the regulations set forth by the urban area’s Management Board.
What Must a Design Firm Prepare to Work with the Management Board?
Typically, this includes drawings of the planned construction items, the scope of work, a list of personnel, and a formal commitment to adhere to the development’s regulations. The more detailed the documentation especially regarding structural elements, technical systems, and exterior features the smoother the review process will be. Specific regulations for Green City will be provided by the Management Board at the time of handover.
When Should You Contact a Design Firm?
It is advisable to reach out several months before the scheduled handover date. Initial steps—such as discussing your needs and ideas, developing design concepts, and establishing an interior direction can be carried out using the developer’s provided documentation. Once the property is handed over, the design firm can conduct an on-site survey to finalize technical drawings and cost estimates, allowing construction to begin sooner.
Is It Convenient to Work with a Firm Based in Ho Chi Minh City for a Project in Duc Hoa?
Vinhomes Green City is located approximately 40 km from the center of Ho Chi Minh City. More important than the distance is ensuring that the firm has a team stationed at the site, a well-organized plan for transporting materials, and a system for providing progress updates such as photographs and formal reports so that the owner can monitor the project remotely.
Do Townhouses and Villas Require Different Design or Construction Firms?
While not strictly required, it is advisable to choose a firm with practical experience relevant to your specific type of property. Townhouses require expertise in managing natural light and functionality within a narrow footprint, whereas villas demand the ability to organize expansive spaces and create a seamless connection with the garden. Before making a final decision, ask to see examples of similar projects they have completed.
How Should You Prepare for the First Meeting with a Design Firm?
You should bring the property documentation provided by the developer (floor plans, elevations, and the unit’s location). It is also helpful to provide information regarding the number of family members, your household’s daily routines, any specific requirements such as a dedicated room for elderly family members, an altar room, or space for a ground-floor business and a few images of interior styles or spaces that you personally admire. This will provide the design team with a solid foundation to begin the process of listening to your needs and tailoring a personalized solution.
Conclusion
Vinhomes Green City provides homeowners with a complete structural shell, while the quality of life within is defined by the choices made thereafter. A reliable design partner for Vinhomes Green City must possess a deep understanding of the specific requirements for townhouses and villas. This involves working with the developer’s documentation well before the handover, producing highly detailed technical specifications, finalizing material selections through physical samples, and overseeing the project through to the final delivery.
Contact 3A Signature to consult with our architects regarding design solutions and complete interior fit-out services for your home at Vinhomes Green City.