At Vinhomes Green City, townhouses and villas are handed over to owners with a completed exterior shell, while the interior remains an empty, unfinished space. For most homeowners, the primary question is not “how beautiful will my home look?” but rather, “what needs to be done before I can move in, who will handle it, and in what order should these tasks be carried out?”
This article provides a comprehensive overview of design and construction services for Vinhomes Green City properties. It covers the specific scope of work tailored to the differences between townhouses, shophouses, and villas the project timeline relative to the handover date, and the final documentation package that homeowners should receive upon completion. This guide is based on the approach 3A Signature employs to finish homes delivered in a “bare-shell” (raw) state.
What Is the Design Service for Vinhomes Green City?
The design service for Vinhomes Green City is a comprehensive package that transforms the raw, unfinished interior of a townhouse, shophouse, or villa into a complete set of project documentation. This includes the functional layout for each floor, interior design, material specifications, lighting schemes, as well as electrical, plumbing, and HVAC (heating, ventilation, and air conditioning) systems detailed enough for submission to the urban area’s management board and for use during the construction phase.

The construction service at Vinhomes Green City serves as the next phase, taking the project documentation to the actual site and continuing the process until the homeowner receives the keys to a residence that is ready for immediate move-in.
Homes Delivered in “Shell” Condition at Green City: What’s Included, and What Requires Additional Services?
Vinhomes Green City is an urban development spanning approximately 197.2 hectares in Hau Nghia, Duc Hoa (formerly in Long An province). It comprises five subdivisions: The Liberty, The Swan Lake, The Island, The Forest, and The Sunrise. All terraced houses, shophouses, semi-detached villas, and detached villas will be delivered with their exteriors fully completed, while the interiors will remain in a “shell” (unfinished) state. The first phase of handovers is expected to begin in the fourth quarter of 2026. To determine what services are needed, one must first understand what is already provided with the property.
What the Developer Provides
For low-rise properties delivered in this condition, the developer typically completes the load-bearing structure, the roof, the entire exterior facade—including doors and railings—and provides utility connection points (electricity and water) at the base of the building. The interior consists of unfinished floors, walls, and ceilings. The specific scope for each unit is detailed in the project documentation and the handover protocol; homeowners should carefully review these documents before planning any interior completion work.
What the Homeowner Needs to Complete
Almost everything that defines the living experience falls under this category: detailed functional layout, electrical systems (lighting and outlets), plumbing for bathrooms and kitchens, air conditioning and ventilation, waterproofing, floor screeding, flooring installation, wall plastering and painting, ceiling installation, interior doors, staircase finishing, sanitary fixtures, kitchen cabinetry, millwork, as well as landscaping for gardens and terraces. This is the scope covered by design and construction services tailored for Vinhomes Green City.
What Cannot Be Altered
As with other Vinhomes urban developments, the exterior of each home must remain consistent with the unified design established for its specific row. Elements such as exterior paint colors, front-facing doors, balconies, awnings, or structural expansions are not matters for a homeowner to decide independently. A professional firm will clarify this from the very beginning, ensuring that all ideas remain within the permitted scope and that project proposals are not rejected by the management board.
What Does a Design Service for Vinhomes Green City Entail?
A comprehensive design service for Vinhomes Green City consists of six stages—ranging from the initial concept and the creation of construction-ready blueprints to overseeing the implementation of those designs on-site.
1. Conceptual Design and Function
This is the step to convert the family’s lifestyle into premises: whether the grandparents’ room is on the ground floor or upper floor, open kitchen or closed kitchen, whether there is a need for an office, worship room, business area or not, which way does light and wind enter the house. The result is the floor plan for each floor and the general aesthetic direction for the entire house.
2. Interior Design and Material Selection
Based on the functional layout, the architect develops interior perspectives for key spaces and compiles a comprehensive material schedule covering stone, wood, tile, paint, fabrics, metals, sanitary fixtures, and lighting. Materials are approved using actual physical samples placed side-by-side, with their specific applications clearly noted, rather than relying solely on digital images viewed on a screen.

3. Construction Technical Documentation
Technical documentation is the decisive factor in ensuring a house is built correctly. This set of documents includes interior layout plans, flooring plans, ceiling and lighting plans, electrical and plumbing schematics, HVAC (heating, ventilation, and air conditioning) designs, detailed drawings for bathrooms, kitchens, staircases, and custom millwork, as well as a comprehensive list of materials specifying codes and technical standards. All technical systems are coordinated with the ceiling and interior design directly within the drawings to prevent conflicts during on-site construction.
4. Documentation for the Property Management Office
Before construction begins, the homeowner must register the work with the urban area’s Property Management Office and submit drawings of the planned construction items. Our service includes preparing the necessary drawings to meet these requirements and assisting the homeowner throughout the administrative process. Specific regulations for Green City will be provided by the Property Management Office upon handover, and the design team is responsible for ensuring the documentation is updated accordingly.
5. Itemized Cost Estimation
Based on the technical documentation, the quantities for each project component are calculated in detail and aligned with the finalized material selections. A clear cost estimate allows homeowners to thoughtfully weigh their options regarding materials and equipment before construction begins, rather than having to make rushed decisions while the work is already underway.
6. Architect’s Site Supervision During Construction
Architect’s site supervision involves the project architect visiting the construction site to verify that elements such as proportions, material tones, lighting, and finishing details align with the original design intent. Although this phase is frequently overlooked in design packages, it is the essential step that ensures the completed home remains true to the visual renderings approved by the homeowner.

What Does the Construction Service for Vinhomes Green City Entail?
The construction service for Vinhomes Green City specifically for units handed over in a “bare-shell” (unfinished) state comprises six categories of work. Since the structural framework and exterior facade are already complete, the structural phase is bypassed, allowing all resources to be focused on technical systems and interior finishing.
1. Preparation of Procedures and Site Survey
The construction team completes the registration process with the building management, providing details on personnel, vehicles, and the schedule for material delivery. Concurrently, a thorough site survey is conducted: measuring the floor elevation on each level, assessing the flatness and perpendicularity of the walls, identifying the locations of utility connection points, and checking for signs of water leakage on the roof, bathroom floors, and terraces.
Any discrepancies are documented supported by written records and photographs and incorporated into the design documentation prior to the commencement of construction.
2. MEP Systems Installation
Electrical lighting and outlets, plumbing (water supply and drainage), HVAC (heating, ventilation, and air conditioning), network infrastructure, security cameras, and smart home devices are installed in accordance with coordinated construction drawings. Pipe and conduit routes are precisely positioned, and elevations are verified prior to the installation of ceilings. Furthermore, all concealed systems are documented (photographed/recorded) before being covered, ensuring ease of future maintenance.

3. Interior Waterproofing and Architectural Finishing
Waterproofing for restrooms, balconies, and terraces is applied and tested for water-tightness prior to the installation of floor finishes. Subsequent stages include screeding, plastering and puttying walls, installing ceilings, laying tiles and stone, painting, fitting interior doors, and completing the staircases. For all tiling and stone-cladding work, levels and grout lines are precisely controlled using laser equipment to ensure a perfectly flat surface and consistent, continuous grout lines throughout the rooms.

4. Interior Construction
Kitchen cabinets, wardrobes, built-in woodwork, decorative wall panels, prayer rooms, sanitary fixtures, and lighting equipment are manufactured and installed according to detailed technical drawings. Hardware components such as hinges, handles, and drawer slides are selected and agreed upon during the material-finalization phase, as these are elements the homeowner interacts with on a daily basis.

5. Gardens, Light Wells, and Terraces
For villas, the garden serves as an extension of the living and dining areas; its construction including elevation, paving materials, and lighting should be seamlessly integrated with the interior design. In the case of townhouses, small pockets of greenery within light wells, balconies, and terraces bring nature into a constrained footprint. At Vinhomes Green City, landscaping is incorporated directly into the construction services, ensuring it is not treated as a separate, secondary phase.
6. Inspection, Cleaning, and Handover
Each phase of the project undergoes inspection at designated milestones before proceeding to the next stage. Upon completion, the property undergoes professional cleaning, and all equipment is tested to ensure proper operation. Finally, the project is handed over to the owner, accompanied by user instructions and details regarding the warranty policy.
Scope of Services Varies by Property Type
While the overall service framework remains consistent, the primary focus shifts significantly across the four types of low-rise properties at Green City.
Terraced Houses (Townhouses)
Typically featuring a frontage of around 5 meters and shared side walls, these homes receive natural light only from the front and back. The service focuses on channeling light and air into the core of the house via skylights or voids, optimizing the placement of staircases and utility shafts, and maximizing every square meter for storage. Detailed principles can be found in our guide on townhome design at Vinhomes Green City.
Shophouses
Shophouses require a dual-functional layout: a ground floor dedicated to commercial use, with the upper levels serving as a private residence. Our services address the need for separate entrances for residents, independent electrical systems for the commercial area, future-proofing the ground-floor layout for potential changes in use, and ensuring the ground-floor facade complies with the overall streetscape regulations.
Semi-Detached Villas
Semi-detached villas feature three open sides and a private garden, while sharing one wall with the adjacent unit. The focus here is on maximizing the use of open sides for the living room and master bedroom, implementing soundproofing for the shared wall, and designing the garden to balance openness with privacy.
Detached Villas
Detached villas offer the largest floor area and the greatest flexibility in interior layout. Our services often extend to artistic lighting, smart home systems, comprehensive landscape design, and specialized spaces such as entertainment rooms, gyms, or relaxation areas. Our approach retaining a classic exterior shell while cultivating a tropical lifestyle within is detailed in our articles on villa design and interior design for Vinhomes Green City.
Design Service Roadmap for Vinhomes Green City: Aligning with the Handover Milestone
The primary distinction between a property delivered in a “bare-shell” (unfinished) state and a home built from the ground up is the existence of a fixed milestone: the handover date. A well-structured design service for Vinhomes Green City centers around this date, ensuring homeowners can move in as soon as possible. 3A divides this roadmap into four phases, synthesized from the company’s 10-step design process and 11-step construction process.
Phase 1: Design Based on Developer Documentation (Pre-Handover)
As soon as the developer-provided documentation including floor plans, elevations, and the unit’s specific location is available, the team begins the process: understanding client needs and personalizing the design, analyzing the context, developing concepts, establishing an interior design direction, and creating interior visualizations. By the time homeowners receive their keys, they already have a clear vision of their home and a preliminary list of materials.
Phase 2: Handover, Site Survey, and Finalizing Documentation
Upon handover, an on-site survey is conducted to assess the actual condition of the property. Any discrepancies from the developer’s original documentation are addressed; subsequently, technical specifications and cost estimates are finalized, and the necessary documentation for submission to the Property Management Board is prepared. This phase also involves completing technical and legal preparations and finalizing the construction schedule.
Phase 3: Construction and Finishing
The construction process for Vinhomes Green City follows a logical sequence: MEP (mechanical, electrical, and plumbing) systems, waterproofing, interior architectural finishing, interior furnishing, and finally, the development of gardens and terraces.
Throughout this phase, a dual-layer supervision system is in place: engineers oversee technical aspects, progress, and safety, while architects ensure the quality of materials, lighting, and spatial proportions. The homeowner, based in Ho Chi Minh City about 40 km from the construction site receives regular updates via photographs and progress reports, and only needs to be present for key inspection milestones.

Phase 4: Handover, Operational Guidance, and After-Sales Support
The project undergoes a comprehensive final inspection and is then handed over, accompanied by instructions on how to operate each system. This is followed by 3A’s post-handover care policy, which includes warranty coverage, maintenance services, and a schedule of periodic inspections for waterproofing, technical systems, and woodwork.
Three Service Models and How to Choose for Your Green City Home
Homeowners can select one of three service models, depending on their desired level of involvement and the time they can dedicate to the project.
Design-Only Service
The homeowner receives a complete set of design documents and then independently hires a construction team. This option is suitable if the homeowner already has a trusted contractor and the time to closely oversee the construction process. It is important to note that if discrepancies arise between the design documents and the actual site conditions, the homeowner must act as the intermediary to resolve the issues.
Design with Architect’s Supervision
In addition to providing design documents, the architect visits the site at key milestones to ensure that construction aligns with the design. This approach helps maintain a higher standard of aesthetic quality; however, the construction team remains solely responsible for technical execution and project timelines.
Turnkey Design and Construction Service
A single firm manages the entire process, from the initial drawings to the final handover. Since the designers and the builders belong to the same team, any points of intersection between design and construction are handled internally, allowing the homeowner to work with a single point of contact.
For properties delivered in a “rough-finish” (shell) state especially in urban developments like Green City that may be located far from the homeowner’s current residence this is the most popular choice. Guidance on how to select a service provider for each of these models is detailed in our article on design firms for Vinhomes Green City.
What Should a Homeowner Receive Upon Completion of Services?
A beautiful home is not the only outcome. Upon the conclusion of a full-service design and construction project such as those at Vinhomes Green City homeowners should receive the following:
- A complete design package: including approved perspectives, floor plans, technical drawings, and detailed specifications.
- As-built documentation: drawings updated to reflect the actual construction as completed.
- Photographic records of concealed technical systems: the locations of pipes, electrical wiring, and conduits within walls, floors, and ceilings, captured before they were covered.
- A comprehensive list of materials and equipment: including names, product codes, and supplier information, to facilitate future replacements or additions.
- Inspection reports for each construction phase, along with a final handover document.
- User manuals and maintenance guides: for air conditioning systems, smart home devices, woodwork, and stone or wood surfaces.
- Warranty terms and a scheduled maintenance plan for individual components.
This documentation is particularly important for homes located in urban developments; it ensures that any future repairs can be carried out quickly and accurately, and helps preserve the property’s value should the owner decide to lease or sell the home.

How Does 3A Signature Approach Design Services for Vinhomes Green City?
3A Signature specializes in the design and construction of villas and townhouses, with a focus on the “Modern Tropical” aesthetic. For Vinhomes Green City, 3A offers both design and construction services, following the four-stage process outlined above.
Experience in Completing “Shell-Condition” (Bare-Shell) Properties
3A has successfully completed the interior fit-out of shell-condition villas at Saigon Mystery Villas a residential development with a management board and construction regulations similar to those at Vinhomes Green City. This experience allows our team to proactively manage every step, from registering for construction and coordinating material deliveries to collaborating with the management board throughout the entire process.
Transparent Documentation of the Construction Process
Our approach to each project phase is documented as seen in the “Lumina Retreat Villa” project at SwanBay covering everything from site surveys and material selection to the installation of concealed HVAC systems and precision tile-laying guided by laser-alignment tools. All images featured in this article are from that specific project, offering homeowners a clear, firsthand look at how each service component is executed on-site.
A Single Point of Contact: From Initial Design to After-Sales Support
The architect responsible for the design remains involved until the final handover, while an engineer is stationed on-site. Homeowners receive regular progress reports and benefit from having a single point of contact who takes full responsibility for the final outcome. Those interested in this model can learn more about 3A’s comprehensive, turnkey villa design and construction services or explore our work at Elyse Island, another project involving the completion of a shell-condition property in the Southern region.
Frequently Asked Questions About Design Services for Vinhomes Green City
What Does the Design Service for Vinhomes Green City Include?
It includes conceptual and functional design, interior design and material selection, technical construction documentation (covering electrical, plumbing, HVAC, ceilings, flooring, and custom millwork details), preparation of documents for the Property Management Board, detailed cost estimation by category, and design supervision throughout the construction process.
Does the Construction Service for Vinhomes Green City Include Structural/Shell Work?
No. Since the structural framework and exterior facade are already completed by the developer, our construction services focus on MEP (mechanical, electrical, and plumbing) systems, waterproofing, interior architectural finishing, interior furnishings, as well as landscaping for gardens and terraces.
Can the Design Process Begin Before Taking Possession of the Property?
Yes. Based on the property documentation provided by the developer, we can begin by understanding your needs, ideas, and design preferences, and developing interior visualizations all before the official handover date. Once an on-site survey is conducted, the technical documentation and cost estimates are finalized to ensure construction can begin promptly.
Does the Service Include Procedures for Registering Construction Work?
With 3A’s full-service package, our team prepares all necessary drawings and documentation. We also assist homeowners in registering construction activities with the urban area’s Property Management Board, including submitting personnel information and material delivery plans in compliance with local regulations.
Do Townhouses and Villas Use the Same Service Package?
While the service framework remains the same, the focus varies. For townhouses, the emphasis is on lighting, ventilation, and optimizing narrow floor plans; for shophouses, it involves separating commercial functions from living spaces; and for villas, the scope extends to garden landscaping, specialized lighting, and dedicated functional areas.
What Documents Do Homeowners Receive Upon Handover?
A complete design package, as-built documentation, photographs of concealed technical systems, a list of materials and equipment, inspection and acceptance records, user manuals, and details regarding the warranty and periodic maintenance schedule for each component.
Conclusion
For properties handed over in a “bare-shell” (rough-finished) state at Vinhomes Green City, the structural envelope is already in place; however, the actual quality of living within is defined by the interior finishing services. A comprehensive design service for Vinhomes Green City encompasses everything from conceptualization, interior design, and material selection to the preparation of technical documentation, coordination with the Property Management Board, cost estimation, and professional design supervision.
A professional construction service for Vinhomes Green City must demonstrate expertise in technical systems, waterproofing, interior finishing, and landscaping ultimately delivering a complete project dossier to ensure the home can be properly maintained over the long term.
By aligning both design and construction processes with the scheduled handover date, homeowners can begin to envision their future residence well before receiving the keys, allowing for an earlier move-in with complete peace of mind.
Contact 3A Signature to consult with our architects regarding the design and construction services best suited for your home at Vinhomes Green City.